Finger Lakes Stormwater Projects

There will be two large stormwater projects taking place within the Finger Lakes drainage basin in early 2026. These projects were identified in the 2020 Island Wide Stormwater Master Plan. These projects will be the 9th and 10th projects completed that were identified for implementation from this master plan. The two projects are outlined below:

  • Finger Lakes Outfall Structure Replacement: The current outfall structure where water from the finger lakes discharges into the marsh is at the end of its design life and allows tidal flooding into the lake system during king tide events.  The structure and the discharge piping will be replaced with a new more resilient system that will prevent tidal flooding and provide automated control of the water level in the lake system.
  • Old Forest Culvert Replacement: Currently there is an 18” corrugated metal pipe that connects two of the Finger Lakes underneath Old Forest Dr.  This pipe is over 40 years old and is undersized.  It will be replaced with a new 4’ x 2’ box culvert that will provide additional flow capacity and a longer service life.

The work on Old Forest Lane requires the excavation and removal of pipe under the roadway. This will necessitate the closure of Old Forest Lane for a period of 8-10 weeks. Beginning on February 2, 2026, Old Forest Lane will be closed at the causeway. The anticipated reopening date is April 6, 2026. Some residents living on Old Forest Lane may have to detour from their normal route as shown in the figure below.

We will work to get this project completed as quickly as possible and restore the normal traffic pattern.

New Compost Location

Some renovations are underway at the recycle center this year. The compost bins have been relocated to the opposite side of the driveway, immediately adjacent to the Club laundry building. The new location is marked and will help reduce non-compost items being placed into the bins. We will also be adding lighting and additional cameras to help enforce illegal dumping at the recycling center.

Landscape Services Contractor Update

Next year, SIPOA will be working with a new landscape services provider. Beginning on January 1, 2026, Southern Legacy will begin landscaping services to maintain SIPOA properties.

SIPOA landscape services are currently 100% electric and Southern Legacy will continue using electric handheld equipment, mowers, and backpack blowers.

The staff at Southern Legacy have experience working on Seabrook Island, and we feel confident they will provide an excellent level of service to the island.

Oyster Catcher Marsh Outfall Excavation Project

You may have noticed some white stakes in the marsh that can be seen from the bridge on Seabrook Island Road as you look toward Oyster Catcher. This is the alignment for the drainage channel that will be excavated in the marsh to promote positive drainage from the end of the stormwater pipe to the tidal channel. The alignment can be seen in the aerial image below. 

This channel existed when the stormwater piping was originally installed, but gradually filled in over time.  This is a maintenance project to ensure that stormwater on Oyster Catcher can drain effectively after a rain event.  It is scheduled to be completed in early 2026.

Fishing Line Recycling Stations

SIPOA recently installed seven fishing line recycling stations throughout the island. The locations of these stations can be found below. The intent is to create awareness and encourage people to recycle used fishing line, rather than throw it in the trash or allow it to become litter.

The used fishing line is collected periodically and sent to a recycling center.

More information can be found here.

  • Lake House (near parking lot on Palmetto Lake)
  • Palmetto Lake (on the Seabrook Island Village side)
  • Crab Dock
  • Kayak Launch
  • Marshgate Fishing Area
  • End of Boardwalk 9 (at the beach)
  • End of Boardwalk 1 (at the beach)

Yellow-Legged Hornet Trapping

You may notice some small plastic insect traps (see photos below) while you are out on the island over the next several months.

The Clemson Department of Plant Industries received a report of a yellow legged hornet that was found on Seabrook Island, and will be setting these traps and checking them on a regular basis.

The yellow legged hornet is an invasive species from Southeast Asia that was first identified in the United States in 2023. More information on this species can be found here.

Document sightings of yellow-legged hornets here.

If you see these traps, please do not disturb them so the investigation team can complete their work.

Any information on yellow legged hornet sightings can be reported to the Clemson Department of Plant Industries by emailing  ajf2@clemson.edu.

New Pumps at Stormwater Pump Station #1

New pumps, motors, and controls were installed at stormwater pump station #1 last week. The old equipment was at the end of its useful life and was scheduled to be replaced this year.

These photos show one of the new pumps being lifted into place by a crane. There is also a photo of the two old pumps and motors that were removed lying on a trailer.

These pumps are 12 feet tall and pump water off of Seabrook Island Rd. near Coon Hollow Ln. after a rain event. These new pumps and controls will allow SIPOA to continue to provide resilient stormwater management in this area.

Adopt-A-Highway – 11/1/25

The next Adopt-A-Highway sweep will be Saturday, November 1, from 9:00am – 11:00am.

Come join us as we pick up litter along Betsy Kerrison Parkway. Meet at the Lake House around 8:45am. The litter sweep starts at 9:00am at the Lake House. Please bring gloves, long pants, and good walking shoes. Bags and pickup sticks will be provided. The Parkway has a paved sidewalk that will be used, and the pickup will last until 11:00am. Let’s keep the entryway to our island clean!

Questions or RSVP to Mary Gwyn at mkginmd@verizon.net (410) 991-3079.

Hope you will be able to join us!

Boardwalk 9 Closed

The king tides this week have caused significant erosion at boardwalk 9.  The boardwalk has been closed at this time. 

Repairs are being planned for next week once the king tides subside.  We plan to reopen the boardwalk next week once the repairs are completed. 

Thank you for your patience as we work to keep our boardwalks safe.