Marsh Hen Stormwater Outfall

SIPOA has completed a project to improve stormwater drainage on Marsh Hen Drive.

This work required permitting to allow for excavation within the salt marsh. Marsh materials were excavated using hydro excavation equipment to restore positive drainage to an existing tidal channel.

The result is a much better functioning stormwater system that will help prevent water on Marsh Hen Drive.