The sand recycling scope of work was completed in December 2024. The seawall repairs were completed on February 21, 2025. The seawall has now been restored to it originally permitted height and condition.
A video showing the length of the current seawall is below. You will notice the significant growth of wet sand beach from the Beach Club towards Dolphin Point. This wet sand beach is accessible at low tide and should continue to grow south as sand moves in this direction.
The contractor will be working on demobilization and site restoration and should be complete by the end of March.