OLD FOREST PIPE REPLACEMENT
Construction is complete on Old Forest Drive.
The undersized pipe has been replaced with a 2ft by 4ft box culvert to increase the flow capacity between the two ponds within the finger lakes.
The road has been replaced and is open to vehicle and pedestrian traffic.

OYSTER CATCHER OUTFALL EXCAVATIONS
The stormwater outfall excavation into the marsh from Oyster Catcher Drive is nearly complete. As of this writing, the contractor has completed 450 out of 500 feet of new channel excavation.
The project should be completed by early April and will provide improved stormwater drainage after a rain event in this area.


FINGER LAKES OUTFALL STRUCTURE REPLACEMENT
Construction will begin in early April to replace the outfall structure that discharges stormwater from the finger lakes into the marsh.
New automated controls will be installed to more effectively control water levels in the lakes and prevent tidal flooding into the ponds.
This work is expected to take 3-4 months.